The length of time covered by an aggregate plan is called ___________.
► Time horizon
► Planning schedule
► Planning horizon
► Master scheduling
Aggregation
Three dimensions of aggregation:
Product families - Based on similar demand requirements and common processing, labor, and materials requirements.
Labor - Considerations include work-force flexibility, physical and geographic locations.
Timing - The planning horizon is the length of time covered by the aggregate plan.
Ref link :
http://docs.google.com/viewer?a=v&q=cache:lOld0dooeIQJ:https://www2.bc.edu/~xueme/MD021/class%2520notes/aggregate%2520planning.doc+time+covered+by+an+aggregate&hl=en&gl=pk&pid=bl&srcid=AD--
--
--
Please visit www.vuzs.net For Current & Old Papers, Quizzes, Assignments and study material.
--
You received this message because you are subscribed to the Google
Groups "vuZs" group.
--
To post a new message on this group, send email to vuZs@googlegroups.com
--
Message Posting Rules: http://groups.google.com/group/vuZs/web/vuzs-basic-rules-for-posting-messages
--
To unsubscribe from this group, send email to vuZs+unsubscribe@googlegroups.com
--
To join this group Send blank email from your virtual university email address to
vuZs+subscribe@googlegroups.com
or visit
http://groups.google.com/group/vuZs/subscribe
---
For more information Contact vuZs Manager at info@vuzs.net
No comments:
Post a Comment