CS605 Software Engineering-II
Quiz
In context of moving range and individual control charts, UNPL stands for: |
Select correct option: |
Universal Natural Process Line
Universal Natural Process Limit
Upper Natural Process Limit
Upper Natural Process Line
Effort required to test a program to ensure that it performs its intended function __________
Testability
Bug fixing
Debugging
Security
Question # 8 of 10 ( Start time: 02:08:47 PM ) | |
The extent to which a program can be expected to perform its intended function with required precision is called ______ |
Usability
Reliability
Portability
Maintainability
Question # 1 of 10 ( Start time: 06:23:45 PM ) Total Marks: 1
___________ help in finding the matrix to be stable or unstable
Select correct option:
Control chart
Directed Graph
Cyclic chart
Base line graph
------------------give you a better insight into the state of the process or product.
Select correct option:
Metrics
Efficiency
Reliability
Usability
Determination of the ....................is a pre-requisite of all sorts of estimates, including,
resources, time, and budget.
Select correct option:
software scope
software Risk
software Quality
software Management
We need to employ some statistical techniques and plot the result ---------------. This is
known as statistical control techniques.
Select correct option:
Graphically
Automatically
Manually
Personally
Question # 6 of 10 ( Start time: 06:26:59 PM ) Total Marks: 1
When more than one user interpret the same requirement in different ways then we can
say that the requirements are
Select correct option:
None of the given
Incomplete
Ambiguous not sure
Incorrect
Question # 7 of 10 ( Start time: 06:28:02 PM ) Total Marks: 1
The extent to which a program satisfies its specifications and fulfills the customer's
mission objectives is …………………
Select correct option:
Integrity
Reliability
Correctness
None of given
Quiz Start Time: 06:23 PM
Time Left 89
sec(s)
Question # 9 of 10 ( Start time: 06:28:52 PM ) Total Marks: 1
In case some software, it is extremely easy to operate with intuitive interface conforming
to most excellent GUI practices of the industry. It needs very little training -----------------
Select correct option:
Less than one hour
Less than two hour not sure
Less than five hour
Less than ten hour
Metrics to assess the quality of the analysis models and the corresponding software
specification were proposed ............
Select correct option:
in 1993- 1999.
Ricado in 1993
Davis in 1990
Davis in 1993
Which statement is correct?
Select correct option:
None of the given not sure
The greater the dependency between the components the lesser is coupling
The lesser the dependency between the components the greater is coupling
The greater the dependency between the components the greater is coupling
Function/Test matrix is a type of
Select correct option:
Interim Test report
Final test report
Project status report not sure
Management report
The most important objective of any engineering activity is to produce high quality
product with limited resources and-----------------------
Select correct option:
Time
Persons
Cost
Metrics
Extent to which access to software or data by unauthorized persons can be controlled and
called ……….…
Select correct option:
None of given
Efficiency
Reliability
Integrity
The amount of computing resources required by a program to perform its function is
…………………..
Select correct option:
Efficiency
Integrity
Reliability
None of given
.........technique was initially developed for manufacturing processes in the 1920's by
Walter Shewart.
Select correct option:
Upper Control Line
Control chart
CMP
Quality
Several entities are always created -------------- and deleted together then this is a strong
indication that they should be grouped into ---------- logical file/files.
Select correct option:
Together, Single
Together, Multiple
Together, Double
All of the given
In measuring Software Process Quality by using control charts, if the gap between the
defects reported and defects fixed is increasing, then it means
Select correct option:
The product is in unstable condition.
The product is ready for shipment
The product is in stable condition.
None of the above
This chart is then used to develop the individual control chart is called statistical control
techniques.
Select correct option:
Yes
No
A --------------entity is the one which have any ----------- in the problem domain without
some other entity.
Select correct option:
Strong, Role*
All of the given
Weak, Function
None of the Given P # 47
of the ....................is a pre-requisite of all sorts of estimates, including, resources, time,
and budget.
Select correct option:
Software scope
software Risk
software Quality
software Management
ILF is a --------------- identifiable group of logically control in formations ------------- the boundary the application.
user, within
user, without
All of the given
user, along
Zindagi mein 2 Logo ka buhat khayal rahkoooo
2nd woh jiss ko tum ney har dukh me pukaara hoo (Mother)
--
--
Please visit www.vuzs.net For Current & Old Papers, Quizzes, Assignments and study material.
To post a new message on this group, send email to vuZs@googlegroups.com
Message Posting Rules: http://vuzs.net/faq/4795-vuzs-google-groups-basic-rules-for-posting-messages.html
--
To unsubscribe from this group, send email to vuZs+unsubscribe@googlegroups.com
--
To join this group Send blank email to vuZs+subscribe@googlegroups.com
or visit
http://groups.google.com/group/vuZs/subscribe
No comments:
Post a Comment